|
|
|
Kontakt
Bächler Top Track AG
Industriestrasse 3
CH-5644 Auw
Tel. +41 (0)56 677 71 00
Fax +41 (0)56 677 71 01
|
|
| |
|
|
|
PIT SOLUTIONS
|
|
|
|
The flexible, inexpensive solution
The ingenious pit components can be assembled on your demand. Thereby it provides endless opportunities to design the system inexpensive and user-optimised.
Concrete pit - rectangular concrete pit, reinforced - dimension outside: 1.4x1.4x1.45 m - entrance 65x65 cm, galvanised cover, lockable - service hatch, lance fundament tube included - one-piece construction circa 1700 kg, two-parts construction circa 2x 850 kg
Combined hydrant - combined hydrant for air and water - one or three-step - filtering of the water included - draining - electrical drive of the valves - heated
Control inclusive power supply unit - compact control for the connection on the control system - emergency shutdown function for the hydrants - power distribution
Satellite pit - square-cut pit, steel-galvanised, 40x40x75 cm, fundament tube included - optional instead of the concrete pit (in pares combined) - connected in parallel - savings: - control power supply unit, combined hydrant, concrete pit
Fundament tube - fundament tube for lance adapter - on site encased in concrete - simple extension of the lance storing position |
 |
 Concrete pit

 Combined hydrant

 Satellite pit

 Fundament tube | |
|
|
|
|
|
|